Prop B Update – 7/29/2021

Elevators Elevator 2 (August 2021): K&S addressing all issues from failed inspection to be complete this week, re-inspection next week. Elevator 3 (September 2021): Camera/Jet of the 8” completed. Elevator Lobbies demo taking place in Bldg C. Steel roof decking being installed with roofing to follow next week. Schindler electrical following roof dry in. Building […]

Read More Prop B Update – 7/29/2021

ICS Named McGrath Contractor

During the July 20th, 2021 Board of Education meeting, the Brentwood School Board unanimously approved ICS as the construction contractor for the new McGrath building. ICS was recommended after a thorough vetting and interview process conducted by District personnel, Board Members, and the school district’s owner’s representative, Navigate Building Solutions. “ICS has shown a commitment […]

Read More ICS Named McGrath Contractor

Prop B Update – 7/8/2021

Elevators Elevator 2 (June 2021) Schindler is on site to complete their scope this week. Final inspection scheduled for next week, day/time TBD. Elevator 3 (July/August 2021)  Utility contractor to start today with area drains. Camera/Jet of the 8” to be scheduled next week. Grading contractor bringing area to rough grade. Building B Update Lobby […]

Read More Prop B Update – 7/8/2021

Prop B Update – 7/1/2021

Elevators Elevator 2 (June 2021) – Schindler to be scheduled for final connection and inspection. K&S to advise. Elevator 3 (July/August 2021)  – Masonry work completed. – Grading contractor bringing area to rough grade. Building B Update Lobby Expansion and Admin Offices (June 2021) Color Art working on options for Principals office furniture Friday 7/2/21.  […]

Read More Prop B Update – 7/1/2021