Below are photos of some of the interior work being completed in the Middle/High School over the past few weeks. With many of the learning spaces ready, work is continuing with the building addition, elevators, and on finishing touches throughout the building.
Prepping lockers for painting. Installing new exterior door frame. Delivery of backsplash for FACS room. Concrete footings for new building addition Excavation work for elevator #2. Installation of ceiling grid. Block wall installation for new building addition. Installation of new drinking fountain. Painting work in main stairwell. Ceramic wall tile installation. Insulation of electrical wiring.